If you have a suitable site, we will work hard to structure a deal that exceeds your expections and to develop the project with the same passion and rigour we do with all our projects. We are consistently told by landowners that they value our approach and that we offer excellent market rates on straightforward terms.
Developers normally need to agree the legal agreement up front to mitigate their risk However, our normal approach is to get going with the project straight away under a very simple exclusivity agreement, delaying the main legals until a later date when time allows. This speeds up the whole process by many months and in some cases by as much as a year if an important survey (such as a seasonal bird survey) would otherwise be missed.
It is difficult to summarise what constitutes a good site as we need to assess a whole range of matters including site details such as wind speed, topography, proximity to dwellings, important landscape or heritage designations and many other site factors, but also wider factors such as grid connection, cumulative development and planning policy. Our computerised GIS system holds a wealth of information on all of this, including predicted wind speeds for the site. We are able to run this fairly quickly and so determine whether the site is likely to offer good potential. We are happy to do this at our cost on a non commital basis. As a pre-requisite however, even for a small wind cluster site we require a minimum of 100 acres of land with no dwelling within about 400m. Of course, only a small amount of this land (typically less than 2%) is taken up by the turbines and associated access roads.
To find out more, please contact us as below or drop us a message via the Quick Contact on the top menu.

Serving Scotland:
Centrally located in Scotland just outside Livingston.